This page was exported from New Real Practice Test With VCE And PDF For Free Download [ http://www.actualtest.info ] Export date:Wed Jan 22 23:55:18 2025 / +0000 GMT ___________________________________________________ Title: Get Passleader New Update IBM C4120-781 Test Questions With Low Cost --------------------------------------------------- Vendor: IBM Exam Code: C4120-781 Exam Name: PureFlex Technical Support V1 QUESTION 1 Power Systems compute nodes communicate over the management network through which controller? A.    Flexible Service Processor (FSP) B.    Integrated Virtualization Management (IVM) C.    Integrated Management Module v1 (IMMv1) D.    Integrated Management Module v2 (IMMv2)Answer: A QUESTION 2 A customer is moving their IBM i environment to PureFlex, and they want to know how they can attach the V7000 disk. Which of the folllowing is correct? A.    IBM i only supports internal storage with PureFlex B.    Direct attached storage is an additional charge C.    IBM i attaches to storage through the VIO server D.    Direct attached storage is included in the system cost Answer: C QUESTION 3 A customer is discussing PSU redundancy alternatives. Which is an advantage of N+1 over N+N for PSU redundancy? A.    Better PSU redundancy B.    Possible lower amperage circuits C.    Greater number of compute nodes supported D.    Chassis can be setup as a dual power domain Answer: B QUESTION 4 A PureFlex prospect is concerned about rack capacity on their single rack configuration. Which of the following is the maximum number of PureFlex chassis that fit in this configuration? A.    2 B.    3 C.    4 D.    5 Answer: B QUESTION 5 Design criteria dictate the use of SAN pass-thru now and the ability to upgrade to full fabric capability later. Which of the following is the most cost effective way to accomplish this? A.    Select the 8Gb SAN Switch module now and enable full fabric functionality later B.    Select the 8Gb SAN Pass-thru module now and enable full fabric functionality later C.    Select the 8Gb SAN Switch module now and switch to Brocade interoperability mode later D.    Select the 8Gb SAN Pass-thru module now and convert to full functionality through activation codes later Answer: A Get Passleader New Update IBM C4120-781 Test Questions With Low Cost --------------------------------------------------- Images: https://farm4.staticflickr.com/3692/13732668955_82213b6921_o_d.png --------------------------------------------------- --------------------------------------------------- Post date: 2014-04-24 02:46:54 Post date GMT: 2014-04-24 02:46:54 Post modified date: 2014-04-24 02:46:54 Post modified date GMT: 2014-04-24 02:46:54 ____________________________________________________________________________________________ Export of Post and Page as text file has been powered by [ Universal Post Manager ] plugin from www.gconverters.com